Европска Унија

  • Креатор на темата Креатор на темата Gags
  • Време на започнување Време на започнување
Dečki, malku poveke treba da rabotite:

bafkreibohtfehadfomch2wwvrpukddnd6vt4pgjbnmtwzc5csuh5bt3bpa
 

The European Commission’s headquarters was forced to shut down its air-conditioning system on Friday due to the heat wave.

Staff working at the Berlaymont building received a text at midday, reading: “BERL — URGENT — Due to extreme weather conditions, forced shut down of air cooling system from floor 1 to 7 for the rest of the day.”

The 13-story building is home to Commission President Ursula von der Leyen, her 26 commissioners and about 3,000 staff. Von der Leyen works on the 13th floor, and most of her commissioners’ offices are housed on floors eight or above.

“It’s like feudalism,”
a Commission official working on a lower level of the Berlaymont, granted anonymity to speak freely, told POLITICO on Friday, referring to the fact that upper floors housing commissioners got to keep their AC on. A second official agreed it was a “disgrace.”
Нека продолжат да пијат јогурт со прицврстено капаче и да не галамат многу!
 
Back
На врв Bottom